Contiguous pile walls are installed using rotary bored or CFA techniques. This type of retaining wall is constructed with spaces between adjacent reinforced concrete piles and is used on a range of engineering or building projects including but limited to road or rail underpasses, underground shafts/tanks, cut and cover tunnels/portals or basements. Contiguous piled walls are used in dry and cohesive soils and are often the quickest and more economic method of constructing retaining walls. In certain ground conditions it may be necessary for the design to incorporate temporary props or ground anchors to provide additional lateral support to the wall. Contiguous bored pile walls are formed by constructing piles using the CFA, LDA or CSP technique. Occasionally, a guide wall is constructed at platform level to aid positional and verticality tolerances. Piles are constructed in a sequence such that no one pile’s integrity is affected by constructing another immediately adjacent pile next. Piles are constructed so that they virtually touch each other with typical gaps of between 50mm-150mm. The soil in the gaps is exposed during excavation and can if necessary be grouted or sealed to form a watertight wall. Normally a secondary lining wall is added to provide a permanent works finish to the wall.
Established in Abu Dhabi, our company has quickly emerged as a trusted partner in the construction industry, known for our expertise in piling and foundation work tailored to meet the unique demands of each project.
Address: Musaffah Shabiya, ME/12 Bdg.217 Office M-02
Email: info@sandroad.ae
Phone: +971 50 911 0470
Keep me up to date with content, updates, and offers from Sand Road