King post/soldier piles and lagging walls are a cost effective system of temporary or permanent retaining wall using beams and pre-cast concrete panels. They are used for retention applications and heights in different ground conditions including rock.Soldier piles are also used for basements, embankment retention and flood defence walls. Lagging walls are a simple and quick installation method. They comprise drilling a hole with a high powered, continuous flight auger (CFA) piling rig, filling it with concrete, then installing an H beam. This allows concrete pre-stressed panels or sleepers to be inserted between the webs of the H sections. Excavation then results in the finished embedded retaining wall.



Established in Abu Dhabi, our company has quickly emerged as a trusted partner in the construction industry, known for our expertise in piling and foundation work tailored to meet the unique demands of each project.
Address: Musaffah Shabiya, ME/12 Bdg.217 Office M-02
Email: info@sandroad.ae
Phone: +971 50 911 0470
Keep me up to date with content, updates, and offers from Sand Road